House 2105 – Site visit 2024-08-29


Roof has been stripped, ceilings are gone. Not much remains above first-floor level.

Now, with the roof stripped out and the space clearly visible, a last-minute change to the loft layout was proposed and tested and approved. And not a small change, the position of the loft stairs was changed to the other side of the building, but it gave a much better space in the loft.